Volkswagen Group starts battery cell development and production in Salzgitter
Start signal: Opening of the pilot line with Thomas Schmall, Dr. Bernd Althusmann, Bernd Osterloh, Dr. Herbert Diess and Frank Blome (from left to right).

Start signal: Opening of the pilot line with Thomas Schmall, Dr. Bernd Althusmann, Bernd Osterloh, Dr. Herbert Diess and Frank Blome (from left to right).